Skip to content
Project Logistics

Project Logistics

Success Cases

For each project, we offer complete, unabridged logistics solutions.

Contact Us
  • Portfolio

Heat Exchanger / 15,7 m x 4,05 m x 4,90 m / 125 ton from door-on-set on pad China x Brazil

  • Oil & Gas
  • Project Logistics

Injection Machine / 65 ton – Door-to-Door Import / Brazil

  • Industrial Projects
  • Project Logistics

Transport and Unload of 10 x Material Handling Machines for a Pulp & Paper Plant in Mato Grosso do Sul, Brazil

  • Project Logistics
  • Pulp & Paper

Biomass Plant / Turn-key Project Export, managed by FOX Brasil

  • Biomass Power
  • Project Logistics

Washer – 9,90 x 5,05 x 5,25 m / 81,76 ton from Finland to Brazil

  • Project Logistics
  • Pulp & Paper

Steam Turbine 160 ton / 7,8 x 5,35 x 4.6 m – Road Transportation & Loading on Heavy Lift Vessel at Santos, Brazil

  • Biomass Power
  • Project Logistics

Road Transport of 2 x 120 ton Equipment

  • Industrial Projects
  • Project Logistics

Hydro Power Plant Project Logistics

  • Hydro Power
  • Project Logistics

74m Wind Blade – Vessel Chartering at Pecem, Brazil

  • Project Logistics
  • Wind Power

110 ton and 75 ton Presses Loaded on Mafi Trailers

  • Industrial Projects
  • Project Logistics

3 x 259 ton / 9,60 x 4,10 x 5,00 m – Transformers Jack Up, Load and Road Transport

  • Project Logistics
  • Thermal Power

Turnkey Projects by FOX Brasil

  • Biomass Power
  • Project Logistics

Turnkey Biomass Power Plant Project Export , managed by FOX Brasil

  • Biomass Power
  • Project Logistics

2 x Charter Vessels with 12 ERTGs 37 x 37 x 11 m 135 ton / each to Rio de Janeiro, Brazil

  • Infrastructure
  • Project Logistics

Transport and Unload at Pulp & Paper Job Site / New Factory – 157 volumes / 3.372 m3 / 1.160 ton

  • Project Logistics
  • Pulp & Paper

Turn-key Recycling Plant / Door-to-Door

  • Industrial Projects
  • Project Logistics

45 ton Gearboxes Loaded on Mafi Trailers

  • Biomass Power
  • Project Logistics

Transformer Transport and Set on Pad at the Substation – 204 ton 10,80 x 5,62 x 5,10 m

  • Project Logistics

Drum Assembly Machining for Pulp & Paper Project / 9,4 x 4,5 x 4,5 m / 63,5 Ton

  • Project Logistics
  • Pulp & Paper

Part Charter with Parts for Windpower Industry to Sao Francisco do Sul, Brazil

  • Project Logistics
  • Wind Power

Discharging a 37 x 37 x 11 m / 135 ton ERTG

  • Project Logistics

Turbine for a Thermal Power Plant in Belem, Brazil

  • Project Logistics
  • Thermal Power

Convenction Part – 67 ton 11,7 x 4,5 x 4,3 m – Sea Freight on RoRo Vessel, in Paranagua, Brazil

  • Biomass Power
  • Project Logistics

Mining Equipment 2 x 9,1 x 4,75 x 4,5 m / each 44 ton – Road Transportation in South America

  • Mining
  • Project Logistics

Biomass Power Plant Turn-key Project

  • Project Logistics

100 ton and 60 ton Transformers Lashed on Board at Itajai, Brazil

  • Project Logistics

Lifting 65 ton Turbine

  • Project Logistics

Charter Party Vessel at Salvador, Brazil

  • Project Logistics

Lifting and Loading Mining Equipment

  • Project Logistics

1 x 70 ton & 1 x 65 ton Presses

  • Project Logistics

Cement Mills & Equipment for a New Plant in Ceará, Brazil

  • Project Logistics

12 x Dumptrucks 11,00 x 3,43 x 3,73 m / each 34 ton Unloaded from Heavy Lift Vessel in Itaqui, Brazil

  • Project Logistics

OOG Boilers Loaded on Flat Rack Containers at Santos, Brazil

  • Project Logistics

121 and 96 ton Presses Loaded on Multiaxle Modular Trailers

  • Project Logistics

Windblades Skid Loaded on Vessel at Pecem, Brazil

  • Project Logistics

Unloading a 56 ton Boiler / 8,81 x 4,01 x 4,01 m on a Petrochemical Plant

  • Industrial Projects
  • Project Logistics

4 x Transformers 8,4 x 3,6 x 4,8 m / 134 ton each / Transport + Set on Pad

  • Project Logistics

Crosstrade Shipment of 1 x 94 ton Generator 7,77 x 4,27 x 3,92 m

  • Project Logistics

Generator on Flat Rack Container

  • Project Logistics

Steam Turbine – 7,35 x 5,50 x 4,8 m / 115 ton at Santos, Brazil

  • Project Logistics

Dismantled Crane Packaging / Wrapping + Export

  • Infrastructure
  • Project Logistics

Biomass Power Plant Turn-key Project

  • Project Logistics

Loading the Clamshell on a Flat Rack Container

  • Project Logistics

Lifting 121 ton Press with a Floating Crane at Santos, Brazil

  • Project Logistics

Jack Up / Set on Pad Transforme

  • Project Logistics

Rigging Inside the Plant with a 500 ton Gantry Crane

  • Project Logistics

Transformer – 7,50 x 3,25 x 4,20 / 117 ton in Salvador, Brazil

  • Project Logistics

Cryogenic Tank units x (15,59 x 2,59 x 3,61 m)

  • Project Logistics

Furnace 10,70 x 3,85 x 4,20 m and Combustion Chamber 11,45 x 3,75 x 3,75 m / Road Transport

  • Project Logistics

Steam Turbine – 6,30 x 4,05 x 3,60 m plus 302 frtons accessories

  • Project Logistics

Biomass Power Plant Turn-key Project

  • Project Logistics

Windblade Skids – 656,33 frtons

  • Project Logistics

Overhead Crane – 2 x 26,20 x 1,95 x 1,80 m + 863,65 frtons Acessories at Rio de Janeiro, Brazil

  • Project Logistics

Biomass Power Plant Turn-key Project

  • Project Logistics

Transformer Road Transport – 8,00 x 3,60 x 4,20 m / 150 ton

  • Project Logistics

Stator 6,7 x 3,6 x 3,2 m 47,2 ton for a Hydro Power Plant

  • Hydro Power
  • Project Logistics

78ton Transformer Loaded into a Container vessel on a Flat Rack bed

  • Project Logistics
  • Thermal Power

Presses Loaded on 2 x Multi-axle Modular Trailer

  • Project Logistics

Transformer Loaded on a Roll Trailer in Paranagua, Brazil

  • Project Logistics

Hydro Power Plant / Lower Bracket Loaded on RoRo Vessel in Santos, Brazil

  • Hydro Power
  • Project Logistics

140 ton + 125 ton Transformers Sea Freight Export from Rio Grande, Brazil

  • Project Logistics
  • Thermal Power

Biomass Plant Turnkey Project handled entirely by FOX Brasil

  • Biomass Power
  • Project Logistics

Stators – 4 pcs x 7,60 x 4,22 x 3,68 m and 455 frtons accessories

  • Project Logistics
  • Uncategorized

Part Charter Vessel Surveillance – 2,135 frtons in Itapoa, Brazil

  • Industrial Projects
  • Project Logistics

76 ton / 16,40 x 2,50 x 2,75 m / Boiler Road Transport

  • Project Logistics

Hydraulic Unit + Gearbox Loaded into a Flat Rack Container in Santos, Brazil

  • Biomass Power
  • Project Logistics

48 ton – Duty Hammer Press

  • Industrial Projects
  • Project Logistics

RoRo Shipment of 10 x Mobile Cranes / 1.474 frtons to Vitoria, Brazil

  • Infrastructure
  • Project Logistics

55 ton / 6,00 x 4,20 x 3,20 m / Press Loaded on Container Vessel as Breakbulk (Export on ATA Carnet)

  • Project Logistics

Steam Turbine – 7,35 x 5,50 x 4,8 m / 115 ton at Santos, Brazil

  • Biomass Power
  • Project Logistics
  • Thermal Power

Turn-key Biomass Plant / Shipments managed by FOX Brasil

  • Biomass Power
  • Project Logistics
en_USEnglish
en_USEnglish